Wind farms - due diligence and transactions

The wind energy market in Poland

Onshore wind energy in Poland is entering a new phase of development after years of constraints arising from the 10H rule. The 2023 amendment to the distance act made it possible to site wind turbines at least 700 metres from residential buildings, provided that the relevant provisions are adopted in the local zoning plan. This has opened the way for new development projects.

Poland has considerable wind potential - particularly in the northern and central regions. Existing onshore wind capacity exceeds 8 GW and the pipeline of new projects is growing rapidly. At the same time, the segment is characterised by regulatory complexity - from planning and environmental requirements, through grid connection procedures, to the auction support scheme.

Grid constraints remain the key challenge. Refusals of grid connection conditions by the operators affect many projects, which increases the value of sites with a secured connection. GCC Energy Consulting supports investors in navigating these challenges at every stage of the investment process.

Wind turbines against a sunset
Our capabilities

What we do in the wind segment

From site potential analysis to transaction closing - we support wind projects at every stage of their life cycle.

Due diligence of wind projects

Comprehensive technical, legal and regulatory analysis. Verification of the wind measurement campaign, analysis of yield forecasts, assessment of environmental and planning risks.

M&A transaction support

Running purchase and sale processes for wind projects. Preparation of transaction materials, coordination of negotiations, structuring of SPA terms.

Regulatory navigation

Support in interpreting the 10H rule after the amendment, analysis of local zoning plan requirements, environmental procedures (EIA), the process of obtaining building permits for wind turbines.

Grid connection

Analysis of grid connection options, support in obtaining grid connection conditions, review of grid connection agreements with DSOs and PSE.

Financing structuring

Financial models for wind farms, viability analysis taking the auction scheme into account, support in raising project finance.

Repowering and modernisation

Analysis of the repowering potential of existing wind farms. Assessment of capacity uprating options, replacement of turbines with newer generations, layout optimisation.

Process

How we run wind projects

1

Screening and qualification

Initial project assessment - analysis of the site, wind conditions, regulatory status, connection availability and compliance with the 10H requirements.

2

In-depth due diligence

Full analysis of the development documentation, verification of the wind measurement campaign, assessment of legal and environmental risks, a report with investment recommendations.

3

Transaction and closing

Negotiation of terms, preparation of transaction documentation (SPA, escrow), coordination of closing and post-transaction processes.

FAQ

Frequently asked questions

Projects in the Farmy wiatrowe segment?

We cover projects from analysis through to closing. Tell us what you need.

Contact

Talk to us about your project

Four simple steps - we will reply within 24 business hours with a concrete proposal.

1 Purpose
2 Profile
3 Details
4 Contact

What are you contacting us about?

Choose the option that best describes your situation. We will match the right support.

GCC Energy Consulting

Sp. z o.o.

Address ul. Chmielna 73B lok. 14
00-801 Warszawa
WhatsApp +48 730 570 260

NIP8961648999
KRS0001158470

We reply within 24 business hours Full discretion and NDA Scope agreed before work begins
Przewijanie do góry