Cable pooling - sharing a grid connection

Definition

What is cable pooling?

Cable pooling is a mechanism that allows a single grid connection to be shared by two or more renewable energy installations of different technologies. It has been regulated under Polish law by Article 7(1d) of the Energy Law.

Cable pooling allows developers to make optimal use of existing connection infrastructure by combining, for example, a solar PV farm with a wind farm within a single grid connection point. The complementarity of the generation profiles allows significantly better use of the connection capacity.

Hybrid project with solar PV and wind turbines seen from a drone against a landscape
Benefits

Why is cable pooling worth considering?

Optimisation of connection costs

Sharing the cost of building the connection infrastructure between several projects significantly reduces the unit CAPEX of each installation.

Better use of capacity

The complementary generation profiles of solar PV and wind allow the connection to be used at a level 40 - 60% higher than for a single technology.

Faster development

The ability to add a new source to an existing connection eliminates the months-long process of obtaining new grid connection conditions.

Higher project value

Hybrid projects with cable pooling achieve higher valuations thanks to a more stable generation profile and better financial metrics.

More stable revenues

Combining technologies with different generation profiles smooths the energy production curve and reduces volume risk.

Integration with BESS

Battery energy storage (BESS) in a cable pooling configuration allows price arbitrage and the elimination of losses caused by grid constraints.

Configurations

Typical cable pooling configurations

We select the optimal technology configuration on the basis of the location, the available connection capacity and the generation profile.

PV + Wind

The most popular configuration. Solar PV generates during the day, wind - mainly at night and in winter. The complementarity of the profiles reaches 70 - 85%.

PV + BESS

Battery energy storage makes it possible to shift solar PV generation to peak hours and to eliminate curtailment. Optimisation of revenues from the balancing market.

Wind + BESS

Stabilisation of variable wind generation and securing supply during the hours of highest prices. Reduction of balancing costs.

Multi-technology hybrids

A combination of three or more technologies - PV + wind + BESS. Maximum use of the connection and the highest generation stability.

Technical requirements

What is needed to implement cable pooling?

  • A shared connection - a single connection point to the DSO/TSO grid with a defined connection capacity, shared by all the installations.
  • A power management system - an automatic control system limiting the total power fed into the grid to the level of the connection capacity.
  • Inter-operator settlements - clear rules for allocating the costs of connection, of infrastructure maintenance and of energy settlements between the participants.
  • A cable pooling agreement - a contract between the parties governing rights and obligations, dispatch priorities and dispute resolution mechanisms.
  • Grid operator consent - acceptance by the DSO or TSO of the cable pooling configuration and approval of the technical parameters of the connection.
Process

How do we implement cable pooling?

1

Site analysis

We assess the potential of the site for cable pooling - available capacity, grid infrastructure, complementarity of technologies, wind and solar resources.

2

Connection design

We design the optimal technical configuration - capacity sizing, metering arrangement, power management system and protection.

3

Cable pooling agreement

We prepare the legal documentation - the agreement between the participants, the settlement rules, dispatch priorities and management mechanisms.

4

Delivery and commissioning

We coordinate the process of obtaining approvals, the construction of the connection infrastructure and the commissioning of the power management system.

FAQ

Frequently asked questions

Looking for support on a renewable energy project?

Whatever the stage - early development, permitting or ready to build - we will take you through the entire process.

Contact

Talk to us about your project

Four simple steps - we will reply within 24 business hours with a concrete proposal.

1 Purpose
2 Profile
3 Details
4 Contact

What are you contacting us about?

Choose the option that best describes your situation. We will match the right support.

GCC Energy Consulting

Sp. z o.o.

Address ul. Chmielna 73B lok. 14
00-801 Warszawa
WhatsApp +48 730 570 260

NIP8961648999
KRS0001158470

We reply within 24 business hours Full discretion and NDA Scope agreed before work begins
Przewijanie do góry